HSU Completed ProjectsEnergy Conservation Projects
This project will construct and install equipment for five energy conservation measures: 1. Heating-ventilation system long life-cycle motors in 12 buildings and variable speed drives in 10 buildings. 2. Hot water boilers in 4 buildings. 3. High efficiency cogeneration system with hot water distribution to 10 buildings. 4. Lighting controls in 7 facilities. 5. Laboratory fume hood controls in 2 buildings. The project is self-funded through avoided energy/utility expense, continues aggressive efficiency practices, alleviates continuously escalating costs and will develop power generation capability: Funding: Third Party (Energy Savings) 2003-04 Total Project Cost: $4,808.167 Construction Cost: $4,238.167 Project Manager: Engineer: Noresco Current Status: Completed Schedule: Last Updated: January 4, 2007 |
| Office of Facilities Management Feuerwerker House 13 1 Harpst Street, Arcata, CA 95521 707.826.4111 Last updated January 4, 2007 |
|