Revised: 1 April 2004 |
|||||
![]() |
The California State University System has embarked on a project
as part of its Integrated Technology Strategy (ITS) to improve the
communications transport system for voice, data, and video. This project has
been designated the Telecommunications Infrastructure Initiative or TII. More
information is available on the CSU site; http://tii.calstate.edu/. |
||||
| This ITS-TII is a systemwide effort to implement a state-of-the-art
telecommunications infrastructure across and among the 23 CSU campuses. The scope of the ITS-TII
is limited to state-owned, permanent buildings. For these buildings, it
includes: |
|||||
| -Inside and outside plant cable and wire facilities, | |||||
| -Design, construction, installation, and all activities associated with "building out" the infrastructure, |
|||||
|
-Media, pathways,
spaces, and terminal resources required for |
|||||
| -Wireline, fiber, wireless distribution facilities, riser cable,
and inside wire, |
|||||
| |
-Terminal resources, wire frames, bridges, hubs, routers, amplifiers, line extenders, LANs, WANs, and video facilities and |
||||
| -Required network
hardware and equipment necessary for the ongoing support of the intracampus infrastructure. |
|||||
| Please visit the following pages provide and overview of the TII project
implementation at Humboldt State University and the latest project updates: |
|||||
|
TII Project Objectives:
Brief overview of service capabilities, including
user access and support which will be available
with the new network. |
|||||
|
Baseline Design Standards: Brief overview of the design criteria for the
physical infrastructure. |
|||||
|
Buildings in TII Project: The
project includes only State-owned, "permanent" buildings. But solutions are being developed
for State-owned, "temporary" buildings. University buildings are classed as either
permanent or temporary. Temporary buildings, typically the houses, are
those that the campus master plan has scheduled to eliminate at some future
time. Monies for capital improvement can not be used on
temporary buildings, regardless of how far in the future the building will be
used to support projects. Temporary buildings are not included in the TII project. |
|||||
|
Space Impact: Telecommunications rooms with controlled and
secure environment must be developed to
accommodate the specialized wiring and equipment.
The criteria for this space is described in The
CSU's Telecommunications Infrastructure Planning
(TIP) Guidelines. The project will impact space in
all TII buildings. |
|||||
|
TII Funding: Sources of funds for the initial build-out and
equipping of the network and its ongoing refresh. |
|||||
|
TII Project Schedule: Detailed project schedule. Major construction will
occur during the 2002/03 academic year. |
|||||
|
Contacts: Names and contact information of people in the forefront
of this project. |
|||||
|
What's New: The latest in project
progress. Nothing posted. |
|||||
|
Construction Alerts:
Near-term construction activities planned for the
project. Nothing posted. |
|||||
| | | | | | | | | | | | | | | | |
What's |
| |
Construction |