HSU Completed Projects

Science B


This project will replace and repair select systems (Group One Equipment, finishes and services.) Construction of the Science Building was completed in January 1969. As a result of its age, the systems are no longer adequate for a CSU facility.

The project will complete the following:

  • Replace environmental chambers
  • Replace autoclave
  • Classrooms 133 & 135
  • Replace fixed seating, lighting and ceiling system

  • Improve HVAC, floor coverings and paint

  • Replace generator and distribute emergency power to each floor level
  • Replace older fume hoods and reseal existing ducting
  • Replace public space floor coverings

Funding:
Capital Renewal 2005-2006

Total Project Cost:
$1,500,000.00

Project Manager:
Mark Baker
(707) 826-3646
mab7001@humboldt.edu

Contractor:
Beacom Construction

Current Status:
Construction

Schedule:
Construction Start: May 2006
Construction End: August 2006

Last Updated:
October 19, 2006

Project Drawings:

1st Floor Lobby Plans
Interior Plans (All Floors)