Bids received for construction bridge over Mattole River
DT Data Page #: 6
Newspaper: Humboldt Times
Newspaper Date: 7/11/1925
Page #: 9
Item Type: Bids received
Place: Mattole River
Text: Bids will be received on 7/10/1925 at 10am for the construction of a steel cable bridge over the Mattole River at Upper Mattole. near the school house.
Key Words: Bridge, Mattole River, Bids Received For Construction
Microfilm Call # : MF 10










