Final work on southbound bridge over Mad River
DT Data Page #: 16
Newspaper: Humboldt Times
Newspaper Date: 7/10/1958
Page #: 23
Item Type: Infrastructure-bridge
Place: Mad River
Text: The southbound bridge over Mad River is ready for final concrete pour and should be open September 1st to traffic. Lowell Allen is resident engineer. This completes the 4 lane highway from Arcata to Bella Vista Hill.
Key Words: Lawell Allen, Southbound Bridge
Microfilm Call # : MF 10










