Jetties

DT Data Page #: 290

Newspaper: Humboldt Times

Newspaper Date: 8/2/1939

Page #: 1

Item Type: Construction

Place: Humboldt Bay South Jetty

Text: Work on the South Jetty is 70% complete. A massive concrete mass - 300' long by 40' wide by 20' thick was poured at the outer end and a 3' thick parapet of concrete was poured to stop the overflow from breakers. Caution - the outer end of the jetty is 7' higher than the shore end.

Key Words: South Jetty, Concrete, Humboldt Bay, Construction

Microfilm Call # : MF 10