Pile Driver set up for work on the Swan bridge
DT Data Page #: 217
Newspaper: Humboldt Times
Newspaper Date: 9/9/1927
Page #: 3
Item Type: Bridge work
Place: Swan Bridge
Text: A 72' foot pile driver is set up & ready for action in prep for the work on the Swan bridge by Mercer Fraser Construction Company crew. Frank Hufford has built 4 cabins at the Evershady campground. R. Bentley has construction 10 cabins on his site just north of the Swan bridge.
Key Words: Swan Bridge, Pile Driver
Microfilm Call # : MF 10










