DT Data Page #
591
Newspaper
Humboldt Times
Newspaper Date
3/6/1929
Page #
11
Item Type
Infrastructure
Place
Mad River Mill Creek
Text
Bids will be opened in Sacramento on March 27th for grading and surfacing with crushed rock 0.9 miles of the Redwood Highway between Mad River and Mill Creek. Also bids for a through-steel truss bridge over the Mad River on the Redwood Highway will be opened on March 13th.
Key Words
Bids
Grading And Surfacing
Redwood Highway
Truss Bridge
Mad River
Grading And Surfacing
Redwood Highway
Truss Bridge
Mad River
Microfilm Call #










